GC
CONTRACTOR COCKPIT
General contractor · residential + commercial
O
Owner
Active Jobs
9
$1.84M total contract value
Open Change Orders
4
2 awaiting signature
June Revenue
$284K
Billed + recognized
Bid Pipeline
$2.4M
7 active proposals
Active jobs — status today
All jobs
JobPhase% CompleteContractStatus
Riverside Kitchen RenoCabinets72%$84KOn schedule
Oakwood AdditionFraming34%$240KOn schedule
Maple Commercial Build-outMEP rough-in48%$420K3 days behind · catching up
Lincoln Master BathTile85%$32KFinal inspection Tue
Sunset Whole-House RemodelDemo12%$580KPermit issue · sorting
Cherry Garage ConversionDrywall62%$48KOn schedule
Today's punch list — across 9 jobs
!
Maple Build-out — electrician callback for 2 outlets
SUB: ACME ELECTRIC · CALLED 9 AM
!
Riverside Kitchen — countertop template appointment
FABRICATOR ARRIVING 1 PM
$
Lincoln Master Bath — change order signed by client
+$3,400 FOR HEATED FLOOR
!
Sunset Remodel — town permit clarification needed
CALL TOWN HALL MONDAY 8 AM
📷
Oakwood Addition — daily progress photos uploaded
12 PHOTOS · CLIENT-VISIBLE GALLERY UPDATED
Sub schedule — today
EL
ACME Electric · Maple Build-out · MEP rough
2 ELECTRICIANS · ALL DAY
PL
FlowState Plumbing · Riverside · final connections
AM ONLY · LUNCH AT 12
TI
Stoneworks Tile · Lincoln · finishing grout + sealant
FINAL DAY · INSPECTION SET TUE
FR
Mendoza Framing crew · Oakwood Addition
FULL CREW · SECOND FLOOR LAYOUT
DR
Solid Wall Drywall · Cherry Garage
TAPING + MUDDING · 2 DAYS LEFT
This week ahead
📅
Tue 9 AM · Lincoln Master Bath final inspection
📅
Wed · Pre-bid walkthrough — Birchwood ADU
EST $180K · COMPETITIVE
📅
Thu · Riverside Kitchen substantial completion
📅
Fri · Subs payroll · 5 sub invoices to process
JobAddressTypePhase%ContractRecognizedDays remaining
Riverside Kitchen RenoRiversideResidential renoCabinets72%$84K$60K14
Oakwood AdditionOakwoodResidential additionFraming34%$240K$82K98
Maple Commercial Build-outMaple PlazaCommercial TIMEP rough48%$420K$201K62
Lincoln Master BathLincoln AveResidential renoTile85%$32K$27K5
Sunset Whole-House RemodelSunset PlMajor renoDemo12%$580K$69K140
Cherry Garage ConversionCherry LnADU conversionDrywall62%$48K$30K22
Hilltop DeckHilltop EstateOutdoor buildFoundation22%$28K$6K40
Brook Hollow HOA pool houseBrook HollowCommercial new buildFraming28%$320K$90K110
Pinewood Kitchen UpdatePinewoodResidential renoCabinets54%$68K$37K32

Bid Management

From walk-through to proposal to signed contract — track every bid through its lifecycle.

  • Walk-through scheduling + photo capture
  • Material + labor estimating with markup rules
  • Subcontractor bid solicitation
  • Proposal PDF generation (your branding)
  • E-signature for proposal acceptance → contract
  • Win/loss reasons captured for future bids
CO #JobDescriptionAmountStatus
CO-2026-018Lincoln Master BathAdd heated floor system$3,400Signed
CO-2026-017Riverside KitchenUpgrade to quartz countertops$4,800Awaiting signature
CO-2026-016Oakwood AdditionAdd bay window$5,200Awaiting signature
CO-2026-015Maple Build-outRe-route HVAC after ceiling change$2,800In negotiation

Sub Management

Sub roster, scheduling, payment, compliance — all in one place.

  • Sub roster with W-9, COI, license expirations
  • Per-sub job assignment + rate
  • Sub invoice processing + AP queue
  • Per-sub quality + on-time scorecard
  • 1099 prep at year-end

Material Operations

Per-job material orders with supplier accounts, delivery scheduling, and on-job inventory.

  • Supplier accounts (Home Depot Pro, 84 Lumber, ABC, etc.)
  • Per-job material list from estimating
  • Delivery scheduling tied to phase
  • Take-off + waste tracking
  • Material returns + restocking fees

Permits + Inspection Tracker

Every permit application, every inspection. Town-specific paperwork.

  • Per-job permit checklist by town
  • Permit application status tracking
  • Inspection scheduling + auto-reminders
  • Inspection results + photo capture
  • Final CO tracking + archive

Safety Operations

Safety meetings, JHAs, incident logging, OSHA compliance.

  • Weekly toolbox-talk delivery + sign-off tracking
  • Job Hazard Analysis (JHA) per project
  • Incident + near-miss log
  • PPE compliance audits
  • OSHA 300 log + annual reporting

Job Photo Pipeline

↘ Same engine as Auto Parts AutoLister — adapted for construction. Daily photo upload from crew phones → AI tag by phase → client-facing gallery.

  • Crew phone uploads (one-tap)
  • AI auto-tag by phase (demo / framing / MEP / drywall / finish)
  • Per-job timeline gallery
  • Client-visible "watch your project" portal
  • Before / during / after compilations for marketing

Progress Billing + AR

Generate AIA-format invoices per phase. Track aging AR.

  • Progress billing (% complete per phase)
  • AIA G702/G703 format generation
  • Lien-waiver attached automatically
  • Stripe + ACH + check reconciliation
  • QuickBooks integration
  • Aged-AR collection sequence

Business Reports

Numbers that matter for a GC.

  • Per-job gross profit + change-order capture
  • Sub performance scorecards
  • Estimating accuracy (bid vs actual cost)
  • Bid pipeline conversion + reasons
  • Crew utilization

↘ Shared engine — from Audit Practice · GC-flavored: 1099 subs, materials sales tax, multi-state contractor licensing

1099 Subs YTD
12
$148K to be 1099'd in Jan
Sales Tax on Materials
$8,400
YTD · resold to clients
Contractor Licenses
2
NJ + PA · both current
Use Tax
$1,840
Out-of-state material purchases
1099 sub tracking — YTD
SubTradeYTD PaidW-9COI1099 Ready
ACME ElectricElectrical$24,800Yes
FlowState PlumbingPlumbing$18,400Yes
Mendoza FramingFraming$32,100Yes
Stoneworks TileTile + stone$14,200Yes
SolidWall DrywallDrywall$22,800⚠ Expires AugCOI renewal
Patel HVACHVAC$18,200Yes

↘ Shared engine — from Audit Practice · GC-flavored: AIA contracts, sub COIs, lien waivers, permit packets

DocumentTypeLinked toStatus
RiversideKitchen-AIA-Contract.pdfAIA contractRiverside KitchenSigned
OakwoodAddition-Permit-Set.pdfPermit drawingsOakwood AdditionApproved
ACMEElectric-COI-2026.pdfSub COIACME ElectricCurrent to Jan 2027
LienWaiver-MapleBuild-Phase2.pdfLien waiverMaple Build-outFiled
SunsetRemodel-Permit-App.pdfPermit applicationSunset RemodelPending town review

↘ Shared engine — from Furniture cockpit · GC-flavored: renovation financing lenders (GreenSky, Hearth, Synchrony), promotional 12/24/36-mo financing for kitchen + bath jobs

Active financed jobs
JobAmountLenderTermStatus
Riverside Kitchen$48,000GreenSky12-mo same as cashApproved · funded
Lincoln Master Bath$28,000Hearth60-mo · 8.9% APRApproved · funded
Pinewood Kitchen$42,000Synchrony Home18-mo promoPending docs
Sunset Remodel$320,000HELOC referralPer bankBank-direct